Plan for Herbert Atkins Road Changes

  • Town Requirement Plan
    • 110 foot easement
    • 4 lane
    • center med
    • sidewalks
    • gutters/storm water
    • 45 mph
    • NO ROOM FOR BARRIER
      • not required by any town ordinance
      • not required by developer
    • Possible Development Agreement
      • clear full 110 feet
      • build center med
      • 2 insdie lanes
      • side ditches
      • no curb or sidewalk
      • no stoem water collection


  • Current 100% Approved (as of 9/25/13)
    • Building one of the new entrances to new development
      • center med
      • inner lanes
      • ditches for storm water run off


  • Upcoming Phases / Proposals
    • Preliminary Subdivision Plan
      • Planning review = Oct 21
      • Town Review = Nov 4
    • Rerouting Herbert Atkins Road Realignment & Development Agreement
      • Herbert Atkins Re-route Details (TBD)
        • 110 feet cleared
        • culvert full width of road
        • ?? # of lanes
        • ?? center med
        • ?? storm water ditch
        • NO Barrier
          • Not required by any ordinance
      • Proposal Phase Dates
        • Planning review = Oct 21
        • Town Review = Nov 4
      • Construction Phase
        • Post Approvals from proposal phase
        • Only require administrative approval--nothing from town or planning board
        • construction drawings are public docs
        • post all approvals --meeting with town staff - pre constrcution
        • Approving Groups / Departments
          • DOT
          • DENR & Core of Eng
            • crossing of creek / protected soils
          • DENR
            • storm drain plan
            • account for pulling storn water from existing neighborhood feeding protected soil area
          • Wake County
            • profile of horizontal & vertical alignment of the road; grading plan & erosion control plan
  • New Development
    • Sunset Bluffs
      • A preliminary subdivision has been submitted and is currently under review for total of 65.75 acres, located off of Herbert Akins Road.  The proposed subdivision will be an open space subdivision with a total of 162 lots and 17.57 acres of open space
  • Land & Road Developer
    • SSBNC LLC &/OR BPROPNC LLC
      • SSBNC, LLC - PO Box 38 Holly Springs NC 27540
      • Bryant Prop - 100 Sunset Oaks Dr Holly Springs, NC 27540 
    • Civil Engineer 
      • B&F Consulting Inc / Russ Briggs
      • 2805 Tobermory Lane - Raleigh NC 27606
      • 919.618.0180
    •  Landscape Architect
      • Tony Tate
      • 5011 South Park Dr, Suite 200 Durham NC 27713
      • 919.484.8880
    • Future Improvements:  
      • DOT (based on traffic patterns) 

No comments:

Post a Comment